Today, I have been working closely on the project Kids and Pranks. To begin with the director was finishing off the lasts of the storyboards by adding the description details of shot types, audio, transitions etc. In the mean time I were doing a shot list for the storyboards by linking up the appropriate details such as shot types, numbers, audio and visuals so we can reference to this when filming.

After this I started doing breakdown sheets for the two different scenes that we are filming. We filled in the cast, crew, props and clothing these are the only ones that apply to this project, as not much is needed. We collected our floor plans and risk assessments from the sound operator as this is whose house the project is going to be filmed at.

In the meanwhile me and the director were working on call sheets so we can put in the appropriate details to cast and crew which we will give them so they know what and where they have to be and what we will be doing on the day. I also made a call sheet for another project for Pause.

From the floor plans that were electronically we got our shot list and storyboards and tried to put together a camera plan in what positions the camera will be in and what shots are appropriate for this. The camera plan we worked with to make a shooting order, which we put in what camera positions and numbers will be where, and the order they will be shot in. Now I need to make schedules for the projects and just alter minor changes in call sheets. Also I need to a location and realise form. 

No comments:

Post a Comment